Vinyl and luxury vinyl plank are the quiet workhorses of a house. Kitchens, bathrooms, laundry rooms, basements and busy entries all put a floor through more than a bedroom does, and vinyl handles that without asking for much in return. It also sits closer to room temperature underfoot than tile.
Two installation methods are used here. Glue-down vinyl is bonded to the prepared subfloor and sits tight and quiet. Click-lock vinyl floats over an underlayment and goes down quickly, with the whole surface moving as one piece. The room and the subfloor decide which is the better fit.
What is included
- Measuring the rooms and planning the direction of the planks
- Removal of the existing floor where it has to come out
- Subfloor flatness checks and repair before installation
- Skim coating or underlayment where the surface calls for it
- Glue-down or click-lock installation, with expansion space where needed
- Transitions at doorways, plus cuts around vents, pipes and cabinets
How the subfloor is prepared
Vinyl is thin, so it follows the surface under it closely. A high spot becomes a visible ridge and a dip becomes a soft patch underfoot. Flatness is checked across the room, high spots are taken down, and low areas are filled or skim coated.
On a slab, the surface is cleaned of old adhesive and loose material before anything goes down. Glue-down work needs a sound, dry surface for the adhesive to bond to, so the moisture reading and the surface condition both matter.
Ottawa humidity and wet rooms
Vinyl is not troubled by the seasonal swing the way wood is, which is part of why it suits basements. That does not remove the need to check a slab for moisture. Water that comes through concrete from below will find a floor laid over it, whatever the material is, so the check happens first.
In bathrooms and laundry rooms, the floor is laid to the room's fixtures and the transitions are set to the height of the adjoining floor. Sealing around the perimeter is discussed rather than assumed.
How the work is planned
The layout line is set so planks run in the direction that suits the longest sight line through the room. In an open main floor, that line usually continues through doorways rather than restarting in each space. Where a room turns a corner, the run is planned so the change is deliberate.
Kitchens and bathrooms need the work sequenced around fixtures. Appliances may need to move, and the floor is usually taken up to the cabinet toe kick rather than under it. That is agreed before the day starts.
When to schedule
Vinyl can be installed through most of the year. Click-lock material should be at room temperature before it goes down, and glue-down work needs a surface that is dry and within the adhesive's conditions. In very cold weather, material that has been stored in a garage or a delivery truck needs time indoors before installation.