Convent Glen is built around the split-level, and that shape decides how a flooring project runs. A short flight of stairs sits at the centre of the plan, with rooms on two or three levels close together. The floor on one level is never entirely separate from the floor on the next.
The other common thread is age. Many homes here have had the same carpet or vinyl for a long time, and the subfloor underneath has not been seen since. Lifting the old floor is the point where the real scope of the work becomes clear.
Working with a split level
A split-level stair is short, often only a few steps, and it usually turns or lands on a small platform. That means the tread depth, the rise and the nosing all have to be measured individually, and the landing has to line up with the floor above it. Getting the landing right is what makes the finished stair read as one piece of work.
Because the levels are close together, material is carried up and down the same short flight through the project. The stair is therefore finished last, so the route stays usable while the rooms are being laid.
Older basement slabs
Basement rooms in this part of Orleans often sit on a slab that has been covered for decades. Once the old carpet and underlay are up, the slab can be checked for flatness, cracks and moisture. Any of those can change the material choice for that room, and all of them are easier to deal with before a new floor is ordered.
Vinyl and laminate are common choices for these rooms because they handle a cooler, damper slab better than solid wood. The reading decides the underlayment, and in some cases it decides that the work should wait for a drier stretch.
Rooms close together
With several small rooms on different levels, the direction of the boards matters more than it would in an open plan. A run that looks right in the living room can land awkwardly at the doorway to the kitchen. The layout is set out on paper first, with the main sight line from the entry as the starting point.
When to schedule
Because the stair is usually part of the job, the sequence is planned around it. Rooms on the upper level are often done first, then the lower level, then the stair. Wood products need time in the room before installation, so the material is ordered early enough to allow for that.
Cost depends on the project. The number of levels, the condition of the slab, the stair and the material all move the total, and the scope is set before any figure is discussed.