Every floor is a layer over another layer. The one underneath decides whether the one on top stays quiet, flat and closed at the joints. Subfloor preparation is the part of the job that is finished before the material is even opened, and it is the part that most often explains a floor that has gone wrong.
Two kinds of subfloor come up most often: wood panels over joists, and concrete slabs at grade or below. Each is checked for flatness, soundness and moisture, and each asks for different preparation before a floor goes over it.
What is included
- Checking flatness across the room in several directions
- Refastening or replacing loose, soft or damaged panels
- Sanding or grinding high spots and filling low areas
- Repairing cracks, hollow spots and old patching on slabs
- Moisture checks in general terms, with more attention on slabs
- Underlayment or a barrier where the material and the room call for one
Wood subfloors
Plywood and oriented strand panels are checked for movement underfoot. A panel that flexes or squeaks is refastened, and a panel that has been water damaged is cut out and replaced. Gaps between panels and any ridges at the joints are dealt with so the surface reads as one plane.
Where the existing panels are too uneven to correct, a new layer can be added over them. That raises the finished floor height, which is measured against door clearances and transitions before the decision is made.
Concrete slabs
Slabs are checked for flatness, cracks and hollow areas. High spots are ground down and low areas are filled with a levelling compound. Old adhesive, paint and loose material are removed so whatever goes over the slab has something sound to bond to.
Moisture is the quiet issue with slabs. Ground moisture moves through concrete slowly, so a slab can feel dry and still carry enough moisture to affect a floor. The reading decides whether a barrier or a particular underlayment is needed, and in some cases whether the work should wait.
Levelling in plain terms
Levelling does not mean making a floor perfectly horizontal. It means removing the local high and low spots that a floor cannot tolerate. A room can slope gently and still be perfectly suitable, as long as the surface is flat across short distances. That distinction is what the straight edge is for.
Underlayment
Underlayment does several jobs depending on the material: it smooths small imperfections, adds a little acoustic separation, provides a barrier over a slab, or gives a floating floor something consistent to sit on. The right choice follows from the subfloor and the material, not from habit.
Ottawa conditions
Ottawa's seasonal swing affects subfloors as well as floors. Wood panels take on and give off moisture with indoor conditions, and basement slabs stay cooler and damper than the rooms above them. Checks are done in the room as it actually is, not as it might be in the middle of summer.
When to schedule
Preparation happens after the old floor is removed and before any new material is opened. Levelling compounds and adhesives need conditions within their limits, so very cold rooms are brought up to temperature first. The preparation is usually the first full day of a project and sometimes more.