Removal is the point where a flooring project stops being a plan and starts being a room with no floor in it. It is also the first time anyone sees the subfloor properly. Taking the old material up carefully matters, because what is underneath sets the scope for everything that follows.
Carpet, vinyl, laminate and tile each come up differently. Some come away in large sheets, some come up in pieces, and some leave adhesive or fasteners behind that have to be dealt with before the subfloor can be assessed.
What is included
- Lifting carpet, underlay and tack strip along the room edges
- Removing vinyl, laminate or tile, along with underlayment where it is loose
- Taking up staples, nails and loose patch from the subfloor
- Removing old adhesive where a new floor needs a sound surface
- Exposing the subfloor so flatness and condition can be checked
- Taking the old material away and clearing the working rooms
What is under the old floor
Under carpet there is usually underlay and tack strip, and often a layer of older flooring that was never removed. Under vinyl there may be a plywood underlayment, old adhesive, or a patch job from a previous repair. Under tile there is a bed of mortar or a cement board, and removing it often takes the surface back to the original subfloor.
Each of these changes what happens next. A thin layer of old vinyl under a new floor might be left in place if it is sound and flat. A loose underlayment has to come up. A soft panel has to be replaced before anything goes over it.
Dust and the rest of the house
Removal is the dustiest part of a flooring project, particularly when tile and old adhesive are involved. Work is kept to the rooms being cleared, doorways are covered where the layout allows, and the site is cleared at the end of each day so the home stays livable.
Where a room has to be emptied, furniture is moved to one side or to another room before work starts. Large pieces and anything fragile are best moved beforehand.
Disposal
Old flooring is taken away as part of the removal. Material is separated where it can be, and the volume is discussed in advance so the day is planned around it. Carpet and underlay take up more space than they look like they will.
Ottawa conditions
Removal exposes the subfloor to the room's air, which in an Ottawa winter is very dry and in summer can be humid. That is one reason the new material is not opened until the subfloor has been checked and prepared. The room is kept at normal living conditions through the work.
When to schedule
Removal happens first, usually on the same day as preparation where the schedule allows. If a room has to be out of use for a stretch, that is planned in advance. Where the material under the old floor raises a question that needs a specialist assessment, the work stops in that area until it is resolved.