Flooring Installation in Beacon Hill

1960s to 1980s homes where a main-floor and a basement update usually arrive in the same conversation.

Beacon Hill was built across a few decades, and the housing runs from compact two-storey homes to larger detached houses on quiet streets. What they share is age: most have original floors that have been covered, recovered or patched at least once.

Projects here usually come in pairs. The main floor gets a new floor, and the basement follows because the old carpet down there has reached the end of its life. Doing both in one sequence is often easier than treating them as two separate jobs.

Main floors in homes of this age

The main floor of a 1970s home often has a smaller footprint than a newer build, with separate rooms rather than an open plan. That makes the layout simpler in one way and more important in another: each room has its own sight line, and the direction of the boards has to work at every doorway.

Where a wall has been removed to open two rooms, the floor is planned as one surface. Where the rooms stay separate, a consistent direction through the doorways keeps the house reading as one floor rather than several.

Basements and older slabs

Basement slabs from this period often sit closer to ground moisture than newer ones. They may also carry cracks, patched areas and old adhesive from a previous floor. All of that is checked once the carpet is up, and the material is chosen for a room that runs cooler and damper than the floor above.

Vinyl and laminate are the common answers, with tile for a bathroom or a laundry area. The slab reading decides the underlayment, and in some cases it decides that the work should wait.

Old flooring under the new

Homes of this age often have a layer of old flooring still in place under the carpet, or vinyl glued directly to the subfloor. Removing it exposes the surface that the new floor will actually sit on. Where the old material is sound and flat, leaving it can be an option, but the height it adds at doorways has to work.

When to schedule

A main floor and basement done together take longer than either on its own, so the sequence is planned before the start date. The upper floor is usually finished first, then the basement and the stair. Wood products need time in the room before installation, which is easier to arrange when the order is placed early.

Cost depends on the project. Two levels, the condition of the slab and the stairs all move the total, and the scope sets out what is included.

12 service areas listed on the service areas hub.

Beacon Hill questions

Can the main floor and basement be done together?

Yes, and it often makes sense. The upper rooms are usually finished first, then the basement and the stair, so there is a usable route through the house for most of the project.

What is typical of a subfloor in a home of this age?

Plywood or board sheathing over joists, sometimes with a layer of older flooring still in place. The check is for movement, flatness and any panel that has been affected by past leaks.

How is old glued down flooring removed?

It is taken up carefully, and the adhesive is dealt with so the surface underneath is sound. Where the old floor is sound and flat, leaving it in place is sometimes an option, depending on the height it adds.

Is a basement floor in a 1970s home different?

The slab is the main difference. Older slabs often sit closer to ground moisture and may have cracks or patched areas, so the reading and the preparation get more attention.

Plank 09 / Start a project

Request a consultation

Tell us the rooms, the current floor and the timing you have in mind. We reply by email with the next step.

Prefer email? info@orleansflooringinstallation.com