Tile Flooring Installation in Orleans

Ceramic and porcelain, set on a base that will not move, with the layout decided before the first tile.

Tile is the most rigid floor in a house, and that is both its strength and its demand. It will not flex to follow a dip in the subfloor and it will not absorb movement from below. Everything it sits on has to be flat, sound and dry.

Ceramic and porcelain are both installed here. The difference between them matters less to the installation than the room does. Entries, kitchens, bathrooms and laundry rooms each bring their own questions about water, traffic and what the floor meets at the doorway.

What is included

  • Measuring the room and setting the tile layout before work starts
  • Removal of the existing floor where it has to come out
  • Subfloor flatness checks, repair and preparation
  • A suitable bed or membrane for the room and the substrate
  • Tile setting with consistent joints and clean cuts at edges
  • Grouting, transitions and trim at doorways and walls

How the subfloor is prepared

Flatness is checked across the room. On a wood subfloor, panels are refastened and any soft or damaged section is replaced. On a concrete slab, the surface is cleaned and checked, and cracks or hollow spots are dealt with before the bed goes down.

In plain terms, the base has to be flat enough that a tile does not rock and solid enough that it does not flex. Where the subfloor cannot meet that, a preparation layer is added rather than the tile being set over a problem.

Wet rooms and entries

Bathrooms, laundry rooms and entries are where tile earns its place. These rooms are planned so water drains away from the walls and the floor meets the adjoining room at a sensible height. Where a floor slopes to a drain, that is set out before the tile is laid.

At the doorway, the transition to wood or vinyl is set to the height difference between the two surfaces. Grout lines are aligned with the room rather than the doorway, so the floor reads straight from the main approach.

Ottawa humidity and slab moisture

Tile itself is not troubled by humidity, but the assembly under it can be. A basement slab that reads damp needs a moisture check and, where required, a membrane before tile goes down. Ottawa's dry winter air also affects grout and adhesive curing, so rooms are kept at normal living conditions during and after the work.

How the work is planned

Layout comes first. Tiles are set out so full tiles land at the most visible edge and cuts fall where they are least noticed. The joint width is chosen for the tile and the room, and the pattern is agreed before any material is mixed.

Tile work is slower than a floating floor and the room is out of use for longer. That is planned into the schedule so a bathroom is not left unusable longer than necessary.

When to schedule

Tile can be installed through the year. Very cold weather matters mainly for material that has been stored outside, since both tile and adhesive need to be at a workable temperature. In occupied homes, the sequence is arranged so the bathroom or entry is out of use for the shortest sensible stretch.

Related services

All services

Tile questions

Does tile need a different subfloor than wood?

It needs a stable one. Tile is rigid, so any movement or flex in the subfloor will show at the joints or the grout. Flatness and how solid the base feels both matter more than they do under a floating floor.

Can tile go over an existing tile floor?

Sometimes, if the existing tile is well bonded and the height it adds at doorways and transitions can be dealt with. It is checked on site, and removal is often the cleaner route.

How long before the floor can be walked on?

It depends on the mortar and grout used and the conditions in the room. The timing is given at handover rather than guessed, and it is longer than for a click-lock floor.

Is tile suitable for a basement bathroom?

It can be, provided the slab is sound and dry. A basement slab needs a moisture check before tile is considered, and the mortar and membrane choice follows from that.

What about grout lines and layout?

Layout is set before the first tile so cuts land at the edges rather than in the middle of the floor. Grout line width is chosen for the tile and the room, and it is agreed before work starts.