Tile is the most rigid floor in a house, and that is both its strength and its demand. It will not flex to follow a dip in the subfloor and it will not absorb movement from below. Everything it sits on has to be flat, sound and dry.
Ceramic and porcelain are both installed here. The difference between them matters less to the installation than the room does. Entries, kitchens, bathrooms and laundry rooms each bring their own questions about water, traffic and what the floor meets at the doorway.
What is included
- Measuring the room and setting the tile layout before work starts
- Removal of the existing floor where it has to come out
- Subfloor flatness checks, repair and preparation
- A suitable bed or membrane for the room and the substrate
- Tile setting with consistent joints and clean cuts at edges
- Grouting, transitions and trim at doorways and walls
How the subfloor is prepared
Flatness is checked across the room. On a wood subfloor, panels are refastened and any soft or damaged section is replaced. On a concrete slab, the surface is cleaned and checked, and cracks or hollow spots are dealt with before the bed goes down.
In plain terms, the base has to be flat enough that a tile does not rock and solid enough that it does not flex. Where the subfloor cannot meet that, a preparation layer is added rather than the tile being set over a problem.
Wet rooms and entries
Bathrooms, laundry rooms and entries are where tile earns its place. These rooms are planned so water drains away from the walls and the floor meets the adjoining room at a sensible height. Where a floor slopes to a drain, that is set out before the tile is laid.
At the doorway, the transition to wood or vinyl is set to the height difference between the two surfaces. Grout lines are aligned with the room rather than the doorway, so the floor reads straight from the main approach.
Ottawa humidity and slab moisture
Tile itself is not troubled by humidity, but the assembly under it can be. A basement slab that reads damp needs a moisture check and, where required, a membrane before tile goes down. Ottawa's dry winter air also affects grout and adhesive curing, so rooms are kept at normal living conditions during and after the work.
How the work is planned
Layout comes first. Tiles are set out so full tiles land at the most visible edge and cuts fall where they are least noticed. The joint width is chosen for the tile and the room, and the pattern is agreed before any material is mixed.
Tile work is slower than a floating floor and the room is out of use for longer. That is planned into the schedule so a bathroom is not left unusable longer than necessary.
When to schedule
Tile can be installed through the year. Very cold weather matters mainly for material that has been stored outside, since both tile and adhesive need to be at a workable temperature. In occupied homes, the sequence is arranged so the bathroom or entry is out of use for the shortest sensible stretch.