Laminate is one of the more forgiving materials to live with and one of the less forgiving to install badly. The planks click together into a single floating surface, which means the whole floor moves as one piece. That behaviour is what makes the subfloor and the expansion allowance so important.
The work here is click-lock laminate, laid over an underlayment suited to the room. Where the subfloor is uneven, the floor will telegraph it: a hollow sound, a joint that works loose, a visible rise. Preparation comes first, as it does with every material.
What is included
- Measuring the rooms and setting the direction of the planks
- Removal of the existing floor where it has to come out
- Checking and correcting the flatness of the subfloor
- Underlayment chosen for the room and the subfloor
- Click-lock installation with expansion space at every fixed edge
- Cuts at doorways, casings, vents and pipes, plus transitions
How the subfloor is prepared
Flatness is checked across the room. Small dips are tolerable within the material's limits, but a rise or a dip beyond them will show. High spots are taken down and low spots are filled, and any loose panel is refastened before underlayment goes down.
On a concrete slab, the moisture reading decides whether a barrier is needed. The underlayment is laid with the seams taped and the edges turned up slightly at the walls, so the floor sits on a continuous surface rather than a patchwork.
Expansion and the floating floor
A floating floor expands and contracts as a single sheet, so the gap at the perimeter does the work for the whole room. Space is left at walls, columns, door frames and thresholds, and it stays hidden under trim. Where a run passes through a doorway into another room, the transition is planned rather than improvised on the day.
Ottawa humidity
Laminate is more dimensionally stable than wood, but it is not unaffected by indoor conditions. Very dry winter air and humid summers still change how the joints sit. A steady indoor environment, correct expansion space and an underlayment that suits the room all reduce movement.
How the work is planned
Planks are laid in a sequence that keeps cut edges at the walls and full boards where they are seen. The layout line is set before the first row so the pattern runs straight through doorways and the last row is a usable width rather than a thin strip.
Rooms are worked one at a time so the home stays usable. Door casings are undercut where needed, and the floor is left clear at the end of each day.
When to schedule
Laminate does not need the acclimation time wood does, but it does need to be on site and at room temperature before installation. Ordering early avoids a delay at the start, and it allows time to check that the material and the room are a sensible match.