Gloucester holds two kinds of work at once. On the residential streets there are older houses, townhouse rows and newer builds, each with its own subfloor and its own history. Along Innes and Ogilvie there are small commercial units, offices and shops that need a floor without closing for a week.
The trade is the same in both. What changes is the schedule, the access and how much of the space can be out of use at one time.
Residential streets
Houses in Gloucester range from small post-war homes to newer townhouses. Older homes usually mean more checking: a floor that has settled, doorways that sit low, and a subfloor that may have been patched more than once. Newer homes usually mean a flatter starting point, though panels affected by construction moisture still need a look.
In townhouse rows, stairs and hallways take the traffic. The layout is planned from the entry through the hall, and the stair is finished last so the route stays usable while the rooms are laid.
Light commercial along Innes and Ogilvie
Small commercial units need a floor that handles traffic and cleans easily, installed without shutting the doors for long. Vinyl is the usual answer, with tile for entries and washrooms. Work is divided into areas that can be closed and reopened, so a route through the space stays open.
Old adhesive is often the biggest part of a commercial job. Removing it properly is what lets the new floor bond, and it is planned into the schedule rather than treated as an extra.
Access and hours
Commercial work is planned around loading, parking and the hours the unit is busiest. Where a space has a shared entrance, material is moved in at agreed times and the common areas are left clean. Adhesive and grout need a set period before an area can reopen, and that time is built into the phasing.
When to schedule
Residential work can be done through most of the year, with wood products needing time in the room first. Commercial work is best booked around a quiet period or a change of tenant. Cost depends on the project: the area, the subfloor, the phasing and the material all move the total.