Blackburn Hamlet has been settled long enough that most of its homes have already been through at least one round of flooring. Carpet laid in the nineties is now worn at the doorways, vinyl in a kitchen has started to lift at the seams, and the rooms have been rearranged more than once.
That history is the useful part of the job. When the old floor comes up, the layers underneath tell you what the house has been through and what the new floor needs from the subfloor.
Replacing worn floors
Worn carpet hides a lot. Under it there is usually underlay, tack strip and a subfloor that has not been looked at in years. Lifting it is the moment to check for movement, for panels that have been cut for wiring or plumbing, and for any patch that was never properly fixed.
The new floor is chosen once that is known. In most of these homes, vinyl, laminate and engineered wood all work, provided the subfloor is brought to a suitable condition first.
Tighter stairs
Stairs in this part of Ottawa are often narrower than in newer builds, with a tighter turn or a shorter landing. That does not change the standard, but it does change the care needed. Each tread is measured, the nosing is set consistently, and the rise is checked from the bottom step to the top so the flight stays comfortable to use.
Additions and changed rooms
Homes that have been extended often have a junction where the original structure meets the newer one. That junction can show up as a step in the subfloor, a change in panel thickness or a slight change in floor level. It is measured and dealt with in the preparation, because a new floor laid over a hidden step will show it at the seams.
Where a wall has been removed to open up two rooms, the floor is planned as one surface so the change is not visible in the finished work.
When to schedule
Most work here is a room or a level at a time, which suits a home that is still in use. The sequence keeps a route through the house, and the stair is finished last where it is part of the scope. Wood products need time in the room before installation, so material is ordered early.
Cost depends on the project. The area, the condition of the subfloor, the stairs and the material all move the total, and the scope is set before any figure is discussed.