Hardwood goes down board by board, and every board needs something sound underneath it. The work begins with the subfloor, the moisture reading and the conditions in the room, well before the first plank is fixed. A wood floor is a living surface in the sense that it takes on and gives off moisture through the year, and the installation has to leave it room to do that.
Solid and engineered hardwood are both installed here. Solid boards are milled from a single piece of wood. Engineered boards are built in layers with a wood surface, which makes them more dimensionally steady and more forgiving over slabs and in basements. The right choice depends on the room, the subfloor and how steady the conditions are, not on a preference for one over the other.
What is included
- Measuring the rooms and setting the layout before material arrives
- Removal of the existing floor where it has to come out
- Checking flatness and refastening or replacing loose subfloor panels
- Underlayment or a moisture barrier where the subfloor calls for one
- Installation with expansion space at walls, frames and thresholds
- Transitions, trim and stair work where they are part of the scope
How the subfloor is prepared
Flatness is checked across the whole room rather than at a few points. A dip in the middle of a floor will show up as a hollow under a board or a joint that opens later. High spots are taken down, low spots are filled, and any panel that moves underfoot is refastened or replaced.
Concrete slabs get more attention. Ground moisture moves through a slab slowly, so the reading matters even when the surface feels dry. Where a barrier is needed, it goes down before the underlayment, not instead of it.
Acclimation and expansion gaps
Wood products are given time in the room before installation, stacked so air can move around the boards, with the home at normal living conditions. The time needed depends on the product and the conditions. It is scheduled rather than added at the end.
Expansion space is left wherever the floor meets something fixed: walls, columns, door frames, pipes and thresholds. It is hidden under trim and covered by transitions, but without it a floor installed in a humid week has nowhere to go in a dry February.
Ottawa humidity
Ottawa indoor air is dry in winter and humid in summer. Wood responds to both. Boards can open slightly at the joints in the dry months and sit tight in the humid ones. That is normal movement rather than a fault, and it is managed with the right allowance, sensible indoor humidity and a layout that does not put a narrow sliver of board where movement will be most visible.
How the work is planned
Rooms are worked in a sequence that keeps the home usable. Furniture moves to one side, the working area is kept to the rooms being laid, and the site is cleared at the end of each day. Stairs and the last transitions are usually finished once the main floors are complete, so the stair stays clear while the floor below is being installed.
When to schedule
Material lead time and acclimation both shape the calendar. Ordering early gives the boards time in the room before work starts, and it avoids a rush at the end. Work can be done through most of the year, though very cold snaps and very humid stretches are worth planning around when a home's conditions are hard to hold steady.