Our Flooring Installation Process

Eleven steps from the first visit to the walk through, in the order they actually happen.

A flooring project is a sequence, and the sequence is what keeps a home livable while the work is underway. The steps below are the shape of a typical project in Orleans or Ottawa. Not every job needs all of them, but nothing is skipped quietly.

01Consultation and site visit

The first visit is about the room, not the sales pitch. We look at the existing floor, what is under it, the width and shape of the space, the stairs if there are any, and how the rooms connect. Door clearances, thresholds and the height a new floor will add are measured at the same time.

This is also where the practical questions get answered: how much of the home has to be cleared, whether the kitchen can stay usable, and whether anything has to wait for the material to settle.

02Measuring

Rooms are measured properly rather than paced out. Openings, closets, angles, columns and the direction of the joists all affect how the material is ordered and how it is cut. A room with more than four corners needs its own notes.

Measurements are also used to work out the layout before any material arrives, including where the first board should start and how the pattern will land at the far wall.

03Written scope

What is included is written down: the rooms, the material, the preparation, the removal, the stairs and the transitions. Anything excluded is named as well, so there is no gap between what is expected and what is being done.

Cost depends on the project, and the scope is what the cost is read against. When something changes on site, it is discussed and agreed before it is carried out.

04Removal of the old floor

Where an old floor has to come out, it is lifted carefully. Carpet, underlay, tack strip, vinyl, laminate and tile all come up differently, and what is underneath decides what happens next.

The subfloor is exposed and inspected at this point. Old adhesive, staples, patch and any soft spots are dealt with before anything new goes down.

05Subfloor preparation

Flatness is checked across the room. High spots are taken down, low spots are filled, and loose panels are refastened or replaced. Where the existing subfloor is not suitable, an underlayment layer may be added.

This stage is unglamorous and it decides how the finished floor behaves. A hollow under a plank or a soft patch under a tile will announce itself later.

06Moisture checks

Moisture is checked in general terms, with more attention on concrete slabs and basements where ground moisture is a factor. The result informs the material choice, the underlayment and, in some cases, whether the work should wait.

Ottawa homes also swing between dry winter air and humid summers. That swing is the reason for acclimation and for expansion allowances at the walls.

07Acclimation

Wood products are given time in the room before installation so they settle to the conditions of the space. The time depends on the product and the conditions, and it is scheduled rather than squeezed in.

Material is stacked so air can move around it, and the room is kept at normal living conditions while it settles.

08Layout lines

Before the first board, the layout is set. The line determines how the floor runs through doorways, how boards land at the walls, and whether the last row is a full board or a thin strip.

Good layout work is invisible in the finished floor. Bad layout work is the first thing anyone notices.

09Installation

The material goes down in the planned sequence, room by room, with the working area kept clear. Cuts are made for doorways, vents, pipes and irregular walls, and expansion space is maintained wherever the floor meets something fixed.

For tile, the bed and the joints are set as the work moves. For wood, laminate and vinyl, the sequence is managed so the last row and the transitions close out cleanly.

10Stairs and transitions

Stairs are usually finished last so they stay clear while the floors below are being laid. Treads, risers and nosing are fitted to match or contrast the main floor, and transitions between materials are set to the height difference.

Thresholds, reducers and end caps are chosen for the gap they have to cover, not simply for appearance.

11Trim and handover

Baseboard, shoe moulding and any trim that was removed goes back on. The site is cleared, offcuts are taken away, and the floor is left clean enough to walk on.

The last step is a walk through the finished work together, with the timing before normal use explained for the material that was installed.

Time before normal use

How soon a floor can be walked on, loaded with furniture or cleaned normally depends on the product and conditions. Adhesive and tile work need longer than a click-lock floor. The timing is stated at handover rather than guessed at the start.

The same applies to the first heating season. Wood floors settle into a home over the first full cycle of dry winter air and humid summer air, and keeping indoor conditions reasonably steady through that cycle is the most useful thing a homeowner can do.

Questions about the process

How long before furniture can go back on the floor?

It depends on the product and conditions. Some floors are ready for light use quickly, while tile and adhesive work needs longer. The timing is stated in the scope rather than assumed.

Do you move furniture?

Small items are moved as part of clearing a room. Large furniture, pianos and built-ins are usually moved beforehand so the room is clear when work starts.

Who supplies the flooring material?

Either way works. Material can be supplied as part of the scope or supplied by the homeowner, provided it arrives in time for acclimation and there is enough to allow for cuts.

What happens if the subfloor needs repair?

The problem is shown and explained before it is covered. Some repairs are small and folded into the day, others change the scope, and that is agreed before the work continues.

How is the site left at the end of the day?

Offcuts and dust are cleared from the working rooms, tools are stacked in one place, and a walkway is left usable where the layout allows.

Plank 09 / Start a project

Request a consultation

Tell us the rooms, the current floor and the timing you have in mind. We reply by email with the next step.

Prefer email? info@orleansflooringinstallation.com